Libretto Del Ponteggio Upd Jun 2026
The logbook must clearly state the load limits for which the scaffolding is designed. This includes:
: Step-by-step guides for safe erection and dismantling.
Recent years have seen a migration toward digital logbooks ( libretto digitale ). libretto del ponteggio
INSPECTION N. 008 – WEEKLY Date: 15/06/2025 – Time: 09:30 Inspector: Ing. Mario Rossi (competent person – cert. n. 123/45) Scaffold ID: Ponteggio Edilizia Nord – Cantiere Via Roma 12
| Type | Frequency | Who performs | |------|-----------|---------------| | Before first use | Once | Erecting company + competent person | | Weekly | Every 7 days | Competent person | | After bad weather | Within 24h of event | Competent person | | After modification | Immediately before re-use | Competent person | | After inactivity >7 days | Before re-use | Competent person | The logbook must clearly state the load limits
Checks performed: ✅ Base plates and adjustable jacks – no settlement. ✅ Verticality – within tolerance (max deviation 1/300). ✅ All couplers tightened – torque check passed (50 Nm). ✅ Guardrails and toe boards – present and secure. ✅ Access ladder – no damaged rungs. ✅ Ties – all present, no corrosion.
: Specific to the exact brand and model of scaffolding being used. INSPECTION N
: Guidelines for checking wear, tear, and corrosion. ⚠️ Libretto vs. Pi.M.U.S.