Are you installing over or directly onto open studs/OSB sheathing ?
Check that the panel is perfectly plumb using a 4-foot level. Fastening Schedule Drive 8d galvanized ring-shank nails along the panel edges. Space edge nails 6 inches apart on-center.
T1-11 has a grooved side (the front) and a smooth side (the back). t1-11 siding installation instructions
Nail through the overlapping joint into the underlying stud.
Drive a nail at this point and stretch a chalk line across the wall. Are you installing over or directly onto open
Work from a corner and move across the wall.
Even if it says "primed," it needs paint. Space edge nails 6 inches apart on-center
Do not overdrive nails, as puncturing the outer ply ruins the water seal. ↔️ Step 5: Joining Subsequent Panels Vertical Edge Joints
Installing T1-11 is a weekend-friendly project for a shed or gable wall. For a full two-story house, you might want to call a pro (lifting 4x9 sheets is heavy and awkward).