T1-11 Siding Installation Instructions [2021] Jun 2026

Are you installing over or directly onto open studs/OSB sheathing ?

Check that the panel is perfectly plumb using a 4-foot level. Fastening Schedule Drive 8d galvanized ring-shank nails along the panel edges. Space edge nails 6 inches apart on-center.

T1-11 has a grooved side (the front) and a smooth side (the back). t1-11 siding installation instructions

Nail through the overlapping joint into the underlying stud.

Drive a nail at this point and stretch a chalk line across the wall. Are you installing over or directly onto open

Work from a corner and move across the wall.

Even if it says "primed," it needs paint. Space edge nails 6 inches apart on-center

Do not overdrive nails, as puncturing the outer ply ruins the water seal. ↔️ Step 5: Joining Subsequent Panels Vertical Edge Joints

Installing T1-11 is a weekend-friendly project for a shed or gable wall. For a full two-story house, you might want to call a pro (lifting 4x9 sheets is heavy and awkward).

Überwachungsmonitor mit mehreren Kamerasichtfenstern und einer Benutzeroberfläche in einem modernen Büro.