Well Testing Equipment =link= Official
Used to store produced liquids temporarily. Gauge tanks allow for manual measurement to calibrate surface flow meters.
Once the fluid passes the choke, it is a chaotic mix of oil, gas, water, and solids. The is the workhorse of the operation. well testing equipment
⚙ – Controls flow rates and drops pressure safely from reservoir to surface equipment. Used to store produced liquids temporarily
A set of high-pressure valves used to control the flow rate and reduce wellhead pressure to a level safe for downstream equipment. It typically features both fixed and adjustable chokes to manage drawdown precisely. the pressure must be controlled.
After measurement, the fluid must go somewhere. In exploration wells, there is often no pipeline connected.
Safety is paramount. Before any fluid reaches the surface, the pressure must be controlled.